Taiwan Security Monitor

Taiwan Arms Sale Backlog, August 2026 Update

Jets and Munitions Begin Delivery

Author: Joe O’Connor & TSM Staff


August 2026, unlike July, showed quite a bit of activity regarding the backlog, including the near-imminent delivery of the F-16C/D Block 70s and ongoing deliveries of munitions for the F-16. Taiwan’s Ministry of National Defense (MND) also announced updates relating to Harpoon Coastal Defense Systems and additional ALTIUS unmanned systems. In August, Congress received no new Foreign Military Sales (FMS) notifications for Taiwan, and no existing sales were fully delivered. The total value of FMS cases notified to Congress but not yet delivered to Taiwan is still $29.72 billion.

Figure 1 shows how the backlog is divided among asymmetric weapons, traditional weapons, and munitions. Arms sales that are only partly delivered are marked in yellow-orange. Table 1 lists all arms sales in the backlog with the latest status updates. Partially delivered sales are shown in italics, while newly announced and fully delivered sales are marked with bold and underlining. 

F-16 Block 70s Start Delivery Flights

On 26 August, Liberty Times reported that the first two Taiwanese F-16C/D Block 70 fighter jets were in transit from the United States to Zhihang Air Base in Taitung. The two jets, numbered 6727 and 6728, reportedly left Lockheed Martin production facilities in Greenville, South Carolina on 17 August, arriving in Honolulu, Hawaii, on 21 August. On 25 August, the two jets arrived at Guam, their last probable stop before arriving in Taiwan. Reporting has indicated that a combination of bad weather around Taiwan and potential mechanical issues has resulted in a delay of the ferry flights.

Because TSM was not able to verify the presence of these two aircraft at Zhihang, an event that would have been reported extensively by the Taiwanese press, we will not be marking the F-16 Block 70 as in delivery for August. Owing to the sale representing $8 billion or roughly 25% of the entire backlog topline, we consider this too important to remove until the first airframes actually arrive on the island.

F-16 Munitions Reported as Partially Delivered

Additional reporting on 20 August detailing preparations for the arrival of F-16s in Taiwan revealed that several sales of munitions for the jets are in progress. An initial batch of AIM-9X Block II Sidewinder air-to-air missiles has already arrived, out of approximately 140 expected in total. The Sidewinder sale was notified to Congress in September 2022 and is worth approximately $86 million. 

The same report also indicated that all 100 AGM-88 High-Speed Anti-Radiation Missiles (HARMs) “have been fully deployed.” Initial batches of AIM-120-C8 Advanced Medium-Range Air-to-Air Missiles (AMRAAMs), out of 200 total, are also in delivery. Combined, the HARMs and AMRAAMs represent a sale of “F-16 Munitions” notified to Congress in March 2023, valued at $619 million. Since both are still in delivery, we have reflected that in Figure 1 and Table 1, for an additional $705 million of items in delivery this month.

The same reporting on the above sales’ delivery statuses also confirmed prior reporting about massive delays in delivery of AGM-154 Joint Standoff Weapons (JSOW) air-to-ground missiles, noting that delivery would not occur until “between 2027 and 2028.” The JSOW sale, the most-delayed sale in the backlog, having been notified to Congress in June 2017, will have been in the pipeline to Taipei for nearly a decade before deliveries even begin, if timelines stay consistent.

Updates on HCDS, ALTIUS Sales, MS-110 Pods

Various updates also emerged about the following sales this month:

HCDS:

On 4 August, the MND made a final contract award for transport of Harpoon Coastal Defense System equipment from manufacturing facilities in the United States to Taiwan. Worth NT$250 million (US$7.8 million), the performance period is scheduled to run from 1 August 2026 to 31 July 2028, indicating that deliveries will end by mid-2028.

ALTIUS:

On 27 August, the MND signed a Letter of Offer and Acceptance (LOA) for the sale of 1,554 ALTIUS-700M loitering munitions and 478 ALTIUS-600M ISR drones, a sale notified in December 2025 worth approximately US$1.1 billion. The final contract award posted on Taiwan’s E-Procurement System, worth NT$26.9 billion (US$876 million) is expected to represent the costs for the physical systems themselves, per Liberty Times reporting. Additionally, the drones are expected to be delivered by the fourth quarter of 2026, but the final delivery deadline was reportedly extended to 2033.

MS-110 Recce Pods:

On 26 August, Liberty Times reported that a ROCAF F-16V carrying an MS-110 reconnaissance pod was sighted around Jiashan Air Base in Hualien, in its first test by the Taiwanese Air Force. While the report did not provide any update on the delivery status (TSM estimates that the sale remains in delivery until otherwise stated), the test remains a good indicator of Taipei’s desire to integrate incoming systems with existing airframes as soon as they arrive on the island.

Contract Awards

One notable US contract award involving a Taiwan backlog item appeared this month. On 17 August, the U.S. Air Force awarded Lockheed Martin a $31.29 million contract for “advisory engineering and technical services” for an undisclosed program. This involved FMS customers, including Taiwan and 10 other countries, all of whom own and operate F-16 fighter jets. Based on that, TSM assesses that this is for engineering services for F-16 Block 70s in Taiwan’s case and other F-16 variants for other FMS customers. 

Table 1
Itemized list of backlogged capabilities by weapons category, August 2026
Capability SoldDollar Value (In Millions)Share of total backlog, July 2026Current Status as of August 2026
Traditional$14,92743.50%
F-16C/D Block 70$8,00026.92%August 2026: First two jets (6727 and 6728) en route to Taiwan, leaving production facility on 17 Aug, reaching Hawaii on 21 Aug, and reaching Guam 25 Aug. Jets not arrived in Taitung by end of August.
Paladin Self-Propelled Howitzer$4,03013.56%May 2026: Liberty Times reports that deliveries of Paladins are expected to start in 2030, due to U.S. production delays.
F-16 IRST Systems$5001.68%December 2025: US DoD awarded an undefinitized contract action to Lockheed Martin for targeting pods, including 55 IRST pods for Taiwan. Work is expected to complete by June 2031.
MS-110 Recce Pods$3671.24%August 2026: Pod sighted on F-16V around Jiashan Air Base, Taitung, undergoing first test of pod since arriving in Taiwan.
MK 75 76mm Gun Mounts$300.10%No information since posting of Congressional notification.
Asymmetric$14,76348.67%
HIMARS (Announced December 2025)$4,05013.63%April 2026: MND issues procurement contract for “long-range precision strike systems,” likely meaning HIMARS, worth US$3.92 billion, with estimated completion in December 2032. Lockheed Martin also received a contract for full-rate production of launchers for U.S. and FMS customers, including Taiwan.
Harpoon Coastal Defense System$2,3707.97%August 2026: MND made final award for contract to transport HCDS equipment from US to Taiwan, worth $7.8 million and expected between August 2026 and July 2028.
National Advanced Surface-to-Surface Air Missile System (NASAMS)$1,1603.90%February 2026: Press reports citing MND sources repeated earlier reporting that Taiwan plans on purchasing 9 additional NASAMS systems and associated missiles. This appears to be one of the arms sales cases being held up by special procurement budget deadlock in the LY.
ALTIUS (Announced December 2025)$1,1003.70%August 2026: MND signs LOA for purchase of 1,554 700M loitering munitions and 478 600M ISR drones, finalizing deal.
Tactical Mission Network$1,0103.40%January 2026: LY votes to move a special procurement budget proposed by the TPP to committee for consideration. The bill would not fund the Tactical Mission Network, but would fund almost all other FMS cases notified to Congress in December 2025.
PAC-3 MSE Interceptors$8822.97%March 2026: MND officials stated that ongoing delivery of 102 MSE missiles should not be affected by conflict in the Middle East.
AN/TPS-77 and AN/TPS-78 Radar Systems$8282.79%September 2025: Taiwanese press report citing 2026 budget request says that all radar systems will be delivered by the end of 2028. TPS-77s scheduled to begin arriving in 2026; TPS-78s to begin arriving in 2027.
MQ-9B Unmanned Aircraft$6002.02%June 2026: Unknown number of drones in Taiwan undergoing assembly and pre-delivery flight testing b/n MND and manufacturer. Also included in MND force structure plan, drones and ground equipment expected to be shipped between July and September 2026.
HIMARS (Announced December 2022)$5201.75%June 2026: Included in MND force structure plan, 18 launchers expected “soon,” consistent with reporting from February 2026.
Javelin Missiles$3751.26%April 2026: MND issues procurement contract for “anti-armor missiles,” likely meaning Javelin or TOW-2B missiles, worth US$162.75 million, with estimated completion in September 2030.
Air-Launched Harpoon Missiles$3551.19%January 2023: Press report indicates that missiles will be delivered by 2030.
TOW Missiles$3531.19%April 2026: MND issues procurement contract for “anti-armor missiles,” likely meaning Javelin or TOW-2B missiles, worth US$162.75 million, with estimated completion in September 2030.
Field Information Communications System$2800.94%June 2026: Taiwanese media reported on immediate combat readiness exercises featuring FICS-equipped vehicles alongside combat units. Reporting also indicated ROCA units had begun fielding FICS systems in February 2026, though it is unclear whether all have been delivered.
C4 Modernization$2650.89%No information since posting of Congressional notification.
Volcano Anti-Tank Mining System$1800.61%June 2026: Included in MND force structure plan, full order of 14 systems expected to ship “soon,” then be organized into “mobile interdiction teams” once in Taiwan, consistent with prior reporting.
Taiwan Advanced Tactical Data Link System Upgrade$750.25%August 2024: Taiwan’s E-Procurement System announced the award of a contract for the Link-16 system with completion date in 2026.
Switchblade 300 Loitering Missile System$600.20%September 2025: Taiwanese press reported details of delivery schedule: 66 drones already delivered to Military Police Command; 150 drones expected to be delivered to ROC Army by end of 2025, 469 drones by the end of 2026.
Munitions$2,3297.84%
AGM-84H SLAM-ER Missile$1,0083.39%December 2025: Taiwanese press report citing a publication by the LY’s budget office indicates a multi-year delay in finalizing details on cost and delivery schedule for AGM-84 missiles. Press report suggests that there is no finalized Letter of Offer and Acceptance (LOA) for this case, which would lay out a payment and delivery schedule.
F-16 Munitions$6192.08%August 2026: Liberty Times reports that all 100 AGM-88 HARM missiles have been “deployed,” and that AMRAAM missiles have also been delivered “in batches.”
Mk 48 Heavyweight Torpedoes (Announced June 2017)$2500.84%July 2026: Taiwanese media reported that due to ongoing delays, the MND was considering “borrowing active inventory torpedoes from the U.S. military.”
AGM-154C Joint Standoff Weapon$1860.62%August 2026: Liberty Times reports that JSOW delivery continues to be delayed until “between 2027 or 2028.”
Mk 48 Heavyweight Torpedoes (Announced May 2020)$1800.61%July 2026: Taiwanese media reported that due to ongoing delays, the MND was considering “borrowing active inventory torpedoes from the U.S. military.”
AIM-9X Block II Missiles$860.29%August 2026: Liberty Times reports that an “initial batch” of AIM-9X Block IIs have been delivered, out of a total of 140. This is an increase of 40 missiles from the initial Congressional notification.